Construction Update

In addition to home construction… July saw the planting of our stormwater catchment pond. Dozens of water plants, tons of river rock and truckloads of soil were installed to filter rainwater before it reaches the public street drainage ditches. This fall, the area surrounding the pond will be landscaped with native plants for additional filtering, erosion control, and wildlife habitat. In August,a small shed was constructed above the cistern that collects rainwater from roof run-off. The shed will house a pump to distribute the rainwater for irrigation. It made a nice father/daughter construction project for Brad & Jessamy.